Picton CBD - London Quay revitalisation project
About the project
The London Quay revitalisation project represents an exciting chapter in the evolution of Picton’s central business district, transforming this beloved thoroughfare into a vibrant, accessible community destination. In 2014-15 Council conducted a trial following a request from the Picton business community and expanded the pedestrian zone and licensed areas on London Quay. The trial received very good feedback and had remained in place for over 10 years. Over the following years, Council received requests from the Picton community advocating for this trial to be made permanent.
Beginning in late May 2025, work commenced to upgrade Picton’s main street connecting the CBD to the Foreshore Reserve, with the wider improvements for Picton noted through the Growing Marlborough strategy. Scheduled for construction through the quieter winter months, the redevelopment delivers an “invigorated streetscape” featuring enhanced landscaping and planting, expanded and levelled pedestrian and dining areas, improved street lighting, and cultural design elements that showcase Waitohi Picton’s identity.
The project respects the current road layout while introducing thoughtful upgrades to public seating, traffic calming, and vital infrastructure, including upgraded water main and stormwater systems, to bolster functionality and resilience.
Mayor Nadine Taylor underscores the project as “an investment of confidence” in Picton as Marlborough’s premier tourist town. Its aim is to ensure London Quay remains a cherished, accessible, and welcoming space, enhancing experience for locals and visitors alike while nurturing the town’s unique communal and tourism appeal.
Project timeline
February 2025
Developed design
April 2025
Investigative works
June 2025
Detailed design and construction tender
July 2025
Construction begins (Area 2 only)
August 2025
Construction ongoing (All areas)
September 2025
Construction ongoing, staged openings of southern areas
October 2025
Project complete
Contact
Have questions or want to learn more about the project, contact us below:
Name: Maighan Watson
Phone: 03 520 7400